Todos News

Design and remodeling Major Surgery Pavilion Hospital de Talagante

AXXIAL SpA has carried out the design and remodeling of areas to generate a Major Surgery Pavilion, Procedure Room with dressing room, Technical Room, equipment room, Surgical Washing and dressing room in the Provincial Hospital of Talagante. This Work included,...
Camas críticas Hospital de Talagante

Conversion of critical beds medical service Hospital de Talagante

Axxial Spa, has supported the Hospital of Talagante in its fight against the Coronavirus Pandemic, carrying out works to improve the existing infrastructure, managing to enable 13 new critical beds in the Medicine Service.
Centro Asistencial Ñuñoa

Infrastructure Maintenance Ñuñoa Healthcare Center

Axxial SpA has developed projects and carried out the maintenance of the infrastructure of the Ñuñoa Healthcare Center, which includes Cesfam Salvador Bustos, which successfully started its activities in December 2020

How BIM platforms can help improve ITO management

BIM during the construction stage will provide multiple tools for the different functions of the ITO, such as verifying discoordination between specialties, verifying geometry and identifying design errors and lack of antecedents in advance, allows to facilitate and improve the controls ...

7 dimensions of BIM, the methodology that will change construction in Latin America

The BIM methodology has important advantages over the traditional CAD methodology, especially in large-scale works, to the point that the execution of many of the large projects carried out in recent years

BIM improves productivity, competitiveness and transparency in the construction sector

Since its inception, the BIM methodology has meant a disruptive change in a historically traditional sector. A sustainable change that involves all the agents involved in the life cycle of any asset, from its planning and design,...